In the 1980's, STFA recognized the growing demand for power generation
in Turkey and organized to undertake the construction of thermal and hydroelectric
power plants. It has since grown to be among the most reliable Turkish
companies in this area. STFA is also capable of executing EPC contracts
in collaboration with reliable partners.
STFA is the first Turkish contractor to have ventured into the field of
154 kV substations erection and is a leader in the installation of 500
kV capacity series capacitor banks.
Design and engineering, material supply, civil works, erection and instrumentation
works, test and commissioning, operation and maintenance, are the contracting
services which are provided by STFA.
The
scope of works:
Thermal
Power Plants Hydroelectric
Power Plants Transformers,
Substations and Switchyard Installations
Some of the major project undertaken:
210
MW Orhaneli Coal Fired Thermal Power Plant (Turkey) 70 MW Özlüce
Hydro Electric Power Plant (Turkey) Aliağa Refinery
4x75 ton/hr Boiler Plant (Turkey) 100 ton/hr Boiler
Plant and Auxiliary Facilities, Karabük (Turkey) Kadıncık II HEPP
(Turkey) Substations and
series capacitor banks of Atatürk Dam 2,400 MW HEPP (Turkey) East/West interconnecting
system (Turkey) Construction
of 51 transformer substations (Iraq)