STFA has undertaken numerous geotechnical engineering and contracting
projects for tunnels, subways, caverns and galleries, dams, high-rise
buildings, offshore structures, pipelines and highways for many decades.
High technology and strong logistic support has consequentally lead STFA's
soil improvement capabilities up to 3000 mm. diameter and 70 m. long piles.
The company has extensive facilities for manufacturing its own equipment
such as buckets, rock augers, chisels and core barrels. This enables the
company to economically cover a wide range of specialty needs.
The
scope of works:
Bored
Cast Insitu Piling Vibro
Piling CFA
Piling Jet
Grouting Diaphragm
Walls Soil
& Rock Anchores Mini
Piling Wick
Drains Excavation
Retaining Systems Underpinning Dewatering Thinwalls
Sheet
Piling Reverse
Circulation Drilling in Rock
Some of the major project undertaken:
Jumeirah Beach Residence, Dubai (U.A.E.) The Palm Jumeirah Shoreline Apartments, Dubai (U.A.E.) Marmaray Project, Dry Docks 1&2 (Turkey) Algier
Metro May 1st Station Jet Grouting Works (Algeria) Abu Dhabi Grand
Mosque Piling Works, the largest piling activity
in the Gulf to date (UAE) Isbank High
Rise Deep Foundation (Turkey) Birecik Dam Thin
Wall Construction ( Turkey) Keban Dam Weir
Improvement (Turkey) Ahmet Yesevi
Mausoleum Jet Grouting Works (Kazakhistan)