soil improvement & foundation works

Piles
1,500,000 m
Mini Piles
240,000 m
 
Sheet Piling
300,000 m²
Jet Grouting
600,000 m
 

STFA has undertaken numerous geotechnical engineering and contracting projects for tunnels, subways, caverns and galleries, dams, high-rise buildings, offshore structures, pipelines and highways for many decades.

High technology and strong logistic support has consequentally lead STFA's soil improvement capabilities up to 3000 mm. diameter and 70 m. long piles. The company has extensive facilities for manufacturing its own equipment such as buckets, rock augers, chisels and core barrels. This enables the company to economically cover a wide range of specialty needs.

The scope of works:

Bored Cast Insitu Piling
Vibro Piling
CFA Piling
Jet Grouting
Diaphragm Walls
Soil & Rock Anchores
Mini Piling
Wick Drains
Excavation Retaining Systems
Underpinning
Dewatering
Thinwalls
Sheet Piling
Reverse Circulation Drilling in Rock

Some of the major project undertaken:

Jumeirah Beach Residence, Dubai (U.A.E.)
The Palm Jumeirah Shoreline Apartments, Dubai (U.A.E.)
Marmaray Project, Dry Docks 1&2 (Turkey)
Algier Metro May 1st Station Jet Grouting Works (Algeria)
Abu Dhabi Grand Mosque Piling Works, the largest piling activity
  in the Gulf to date (UAE)
Isbank High Rise Deep Foundation (Turkey)
Birecik Dam Thin Wall Construction ( Turkey)
Keban Dam Weir Improvement (Turkey)
Ahmet Yesevi Mausoleum Jet Grouting Works (Kazakhistan)



Copyright © STFA Holding Co.

Ýþ Bank Foundation
(Turkey)
The Palm Jumeirah Shoreline Apartments, Dubai
(U.A.E.)
Ahmet Yesevi Tomb
(Kazakistan)
Algeria Metro, May 1st
Station Tunnel
(Algeria)