soil
improvement & foundation works

|
Piles
1,250,000
m
|
Mini
Piles
250,000
m |
|
Sheet
Piling
250,000
m² |
Jet
Grouting
500,000
m |
|
STFA has undertaken numerous geotechnical engineering and contracting
projects for tunnels, subways, caverns and galleries, dams, high-rise
buildings, offshore structures, pipelines and highways for many decades.
High technology and strong logistic support has consequentally lead STFA's
soil improvement capabilities up to 3000 mm. diameter and 70 m. long piles.
The company has extensive facilities for manufacturing its own equipment
such as buckets, rock augers, chisels and core barrels. This enables the
company to economically cover a wide range of specialty needs.
The
scope of works:
Bored
Cast Insitu Piling
Vibro
Piling
CFA
Piling
Jet
Grouting
Diaphragm
Walls
Soil
& Rock Anchores
Mini
Piling
Wick
Drains
Excavation
Retaining Systems
Underpinning
Dewatering
Thinwalls
Sheet
Piling
Reverse
Circulation Drilling in Rock
Some of the major project undertaken:
Algier
Metro May 1st Station Jet Grouting Works (Algeria)
Abu Dhabi Grand
Mosque Piling Works, the largest piling activity in the Gulf to date (UAE)
Is Bank High
Rise Deep Foundation (Turkey)
Birecik Dam Thin
Wall Construction ( Turkey)
Keban Dam Weir
Improvement (Turkey)
Ahmet Yesevi
Mausoleum Jet Grouting Works (Kazakhistan)

Copyright © 2006 STFA Holding Co.
|
|
|
 |
|
Ýþ
Bank Foundation
(Turkey)
|
 |
|
Ahmet
Yesevi Tomb
(Kazakistan)
|
 |
|
Algeria Metro, May 1st
Station Tunnel
(Algeria)
|
|