| |
water
intakes & outfalls

|
Intakes/Outfalls
30,000
m
|
|
|
Among the extensive experience on Marine works, STFA has been completed
many intakes and outfalls, by implementing special techniques and state-of-the-art
equipment and made every impossible to an innovative engineering solution.
Depending to the project requirement and criteria, the vented S-bending,
bottom-tow and under water multi-segment assembly techniques can be applicable
for pipelines. Furthermore, reinforced concrete culvert segments or water
intake structures up to 1000 tons are also possible to be installed with
STFA fleet at our disposal.
The
scope of works:
Precast
Intake Structures
Pumphouse
Structures
Underwater
Discharge & Intake Pipelines
Underwater
Precast Concrete Culverts
Rubble
Mound Water Intake Basins & Structures
Some of the major project undertaken:
Iskenderun
Sugözü Power Plant, Intake and Discharge Line, Ø2400 and Ø2800 mm (Turkey)
Marmara Ereğli
Power Plant, Intake and Discharge Line, Ø2400 mm Bonna Type Pipes (Turkey)
Antalya Outfall,
Ø1600 mm HDPE (Turkey)
Büyükçekmece
Outfalls, Ø1600 mm HDPE (Turkey)
Ahırkapı Discharge,
Ø1200 mm steel-concrete composite (Turkey)
Çolakoğlu Power
Plant, various size culverts (Turkey)
North Cyprus
Water Supply (TRNC)

Copyright © 2006 STFA Holding Co.
|
|
contact
infomarine&ports@stfa.com
|
|
|
|
Ahırkapı
Outfall
(Turkey)
|
|
|
|
Natural
Gas Power Plant,
Intake Lines, Diliskelesi
(Turkey)
|
|
|
|
Natural
Gas Power Plant,
Diliskelesi
(Turkey)
|
|
|
|
İskenderun
Sugözü
Power Plant
(Turkey)
|
|