30,000 m
   

Among the extensive experience on Marine works, STFA has been completed many intakes and outfalls, by implementing special techniques and state-of-the-art equipment and made every impossible to an innovative engineering solution. Depending to the project requirement and criteria, the vented S-bending, bottom-tow and under water multi-segment assembly techniques can be applicable for pipelines. Furthermore, reinforced concrete culvert segments or water intake structures up to 1000 tons are also possible to be installed with STFA fleet at our disposal.

The scope of works:

Precast Intake Structures
Pumphouse Structures
Underwater Discharge & Intake Pipelines
Underwater Precast Concrete Culverts
Rubble Mound Water Intake Basins & Structures

Some of the major project undertaken:

Iskenderun Sugözü Power Plant, Intake and Discharge Line, Ø2400 and Ø2800 mm (Turkey)
Marmara Ereğli Power Plant, Intake and Discharge Line, Ø2400 mm Bonna Type Pipes (Turkey)
Antalya Outfall, Ø1600 mm HDPE (Turkey)
Büyükçekmece Outfalls, Ø1600 mm HDPE (Turkey)
Ahırkapı Discharge, Ø1200 mm steel-concrete composite (Turkey)
Çolakoğlu Power Plant, various size culverts (Turkey)
North Cyprus Water Supply (TRNC)




Copyright © 2006 STFA Holding Co.

contact
infomarine&ports@stfa.com

Ahırkapı Outfall
(Turkey)
Natural Gas Power Plant,
Intake Lines, Diliskelesi
(Turkey)
Natural Gas Power Plant,
Diliskelesi
(Turkey)
İskenderun Sugözü
Power Plant
(Turkey)