STFA Temel Araştırma ve Sondaj A.Ş. has signed a contract with TVF Rafineri ve Petrokimya San. ve Tic. A.Ş on 10.02.2021 to carry out the geotechnical investigations of the Refinery and Petrochemical facility of TVF in Hatay, Dörtyol area.
Within the scope of the project, On land; a total of 2250 m drilling, 50 nos CPTu test, various in situ tests, Geophysical Measurements, Seismic Assessment, Geological mapping, geotechnical reporting and at nearshore, a total of 800 m drilling, 10 nos Sea Bed CPT u, various in situ tests, bathymetric, side-scan sonar, magnetometer and sub-bottom profiling will be measured and SHOD approvals will be obtained for bathymetric studies. The project has started preparations for mobilization and the delivery time is 90 days, excluding relevant technical report approvals from ministries. For field works on land, a total of 4 nos drilling rigs, Land CPT, various geophysical, in situ test equipment’s and for nearshore Works Ergun Hoca, Jack Up, Taner Mut Barge, Sea Bed CPT, tugboat will be utilized.